1. pl
  2. en

Contact

Kia Carnival Hybrid SX Prestige '25

60 800 € - export price in Europe

267 700 zł - price in Poland (VAT invoice 23%)

Description:

Meet the Kia Carnival Hybrid SX Prestige – a modern van that redefines family travel comfort! The hybrid 1.6L Turbo GDI powertrain producing 242 HP delivers dynamic performance while keeping fuel consumption in check. A spacious 7-seat interior, smart power liftgate, and sliding rear doors make everyday use effortless, while a rich suite of driver-assist features – including collision-avoidance and lane-keeping assist – guarantees the highest level of safety. This is a vehicle built for those who want modern technology paired with practicality.

11 July 2026

AUTO SPECIFICIATIONA

Category: Van
Transmission: Automatic
Fuel: Hybrid
Year: 2025
Mileage: 10300 km
Power: 242 HP
Engine capacity: 1600 cm³
Number of seats: 7
Number of doors: 4/5
Color: GRAY
Origin: USA

 

 

 

Mechanical & Powertrain

Engine: 1.6L Turbocharged GDI

Transmission: 6-Speed Automatic -inc: Shift-by-wire

GVWR: TBD

Engine Auto Stop-Start Feature

Transmission w/Driver Selectable Mode

Front-Wheel Drive

3.65 Axle Ratio

Hybrid Electric Motor

90-Amp/Hr 850CCA Maintenance-Free Battery w/Run Down Protection

2 Skid Plates

Gas-Pressurized Shock Absorbers

Front Anti-Roll Bar

Electric Power-Assist Speed-Sensing Steering

19 Gal. Fuel Tank

Single Stainless Steel Exhaust w/Black Tailpipe Finisher

Strut Front Suspension w/Coil Springs

Multi-Link Rear Suspension w/Coil Springs

Regenerative 4-Wheel Disc Brakes w/4-Wheel ABS, Front Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake

Lithium Ion (li-Ion) Traction Battery 1.49 kWh Capacity

Safety

Lane Following Assist (LFA)

Side Impact Beams

Dual Stage Driver And Passenger Seat-Mounted Side Airbags

Blind-Spot Collision-Avoidance Assist (BCA) Blind Spot

Forward Collision-Avoidance Assist (FCA-JT: Cyc/Ped/Junction Turning)

Collision Mitigation-Front

Driver Monitoring-Alert

Evasion Assist

Tire Specific Low Tire Pressure Warning

Dual Stage Driver And Passenger Front Airbags

Curtain 1st, 2nd And 3rd Row Airbags

Airbag Occupancy Sensor

Driver Knee Airbag

Rear Child Safety Locks

Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point, Height Adjusters and Pretensioners

Front Camera

Left Side Camera

Right Side Camera

Interior

8-Way Passenger Seat

Front Center Armrest and Rear Seat Mounted Armrest

Manual Tilt/Telescoping Steering Column

Heated Leather Steering Wheel

Front Cupholder

Rear Cupholder

Compass

Remote Releases -Inc: Smart Power Liftgate Proximity Cargo Access

HomeLink Garage Door Transmitter

Cruise Control w/Steering Wheel Controls

Smart Cruise Control - Machine Learning (SCC-ML)

HVAC -inc: Underseat Ducts and Headliner/Pillar Ducts

Illuminated Glove Box

Driver Foot Rest

Full Cloth Headliner

Leather/Metal-Look Gear Shifter Material

Interior Trim -inc: Piano Black/Metal-Look Instrument Panel Insert, Piano Black Door Panel Insert, Piano Black Console Insert and Piano Black/Chrome Interior Accents

Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination, Driver And Passenger Auxiliary Mirror

Day-Night Auto-Dimming Rearview Mirror

Full Floor Console w/Covered Storage, Mini Overhead Console, 2 12V DC Power Outlets and 2 Interior 120V AC Power Outlets

Front And Rear Map Lights

Fade-To-Off Interior Lighting

Full Carpet Floor Covering

Carpet Floor Trim

Cargo Features -inc: Tire Mobility Kit

Trunk/Hatch Auto-Latch

Cargo Space Lights

Tracker System

Instrument Panel Bin, Driver / Passenger And Rear Door Bins

Delayed Accessory Power

Driver Information Center

Outside Temp Gauge

Digital Appearance

Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints

2 Seatback Storage Pockets

Perimeter Alarm

Immobilizer

2 12V DC Power Outlets

Air Filtration

2 12V DC Power Outlets and 2 Interior 120V AC Power Outlets

Exterior

Wheels: 7.5J x 19" Alloy Dark Edition -inc: Black customizing

Tires: P235/55R19 Low Rolling Resistance

Tire Mobility Kit

Body-Colored Front Bumper w/Black Rub Strip/Fascia Accent and Black Bumper Insert

Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent and Black Bumper Insert

Metal-Look Bodyside Insert

Black Side Windows Trim

Chrome Door Handles

Black Power Heated Side Mirrors w/Power Folding and Turn Signal Indicator

Fixed Rear Window w/Wiper and Defroster

Deep Tinted Glass

Rain Detecting Variable Intermittent Wipers

Fully Galvanized Steel Panels

Lip Spoiler

Black Grille w/Chrome Accents

Proximity Sliding Rear Doors

Smart Power Liftgate Power Liftgate Rear Cargo Access

Headlights-Automatic Highbeams

Front Fog Lamps

Auto On/Off Projector Beam Led Low/High Beam Daytime Running Auto-Leveling Auto High-Beam Headlamps w/Delay-Off

LED Brakelights

Laminated Glass

 

Similar

arrow left
arrow right

WE DON'T HAVE ANYTHING YOU NEED,

BUT WE HAVE EVERYTHING YOU WANT.

CANCARS.eu